• Location: Gulf of Mexico
  • Project date: March – April 2023
  • Drilling duration: 55 days
  • Total footage drilled: 16,143ft 
  • Waste fluid savings: $1,737,970.00
  • Total saving: $2,204,897.00

OVERVIEW

The overall aims of the project were to:

  • Achieve governmental oil on wet cuttings (OOWC) limitations in line with EPA reporting
  • Optimise solids control equipment to deliver maximum solids removal with minimum liquid retention
  • Reduce synthetic based mud surface consumption
  • Reduce shaker screen consumption
  • Minimise environmental impact
  • Reduce carbon footprint 

All objectives achieved without the use of a cuttings dryer package.

 

1,984.80 

»

Fewer barrels of mud used
$375,127.00

»

Saved on mud costs
$1,737,970.00

»

Waste fluid savings
4.25%

»

Final well ROC%
Carbon Footprint

»

Of drilling asset was reduced

 