- Location: Gulf of Mexico
- Project date: March – April 2023
- Drilling duration: 55 days
- Total footage drilled: 16,143ft
- Waste fluid savings: $1,737,970.00
- Total saving: $2,204,897.00
OVERVIEW
The overall aims of the project were to:
- Achieve governmental oil on wet cuttings (OOWC) limitations in line with EPA reporting
- Optimise solids control equipment to deliver maximum solids removal with minimum liquid retention
- Reduce synthetic based mud surface consumption
- Reduce shaker screen consumption
- Minimise environmental impact
- Reduce carbon footprint
All objectives achieved without the use of a cuttings dryer package.
1,984.80 |
» |
Fewer barrels of mud used |
$375,127.00 |
» |
Saved on mud costs |
$1,737,970.00 |
» |
Waste fluid savings |
4.25% |
» |
Final well ROC% |
Carbon Footprint |
» |
Of drilling asset was reduced |
Download a PDF copy of this Historical Data sheet.