OVERVIEW

A leading offshore exploration and production company with Deepwater and shallow water assets in the Gulf of Mexico contracted TEMS International to support drilling operations.

TEMS Technical Environmental Specialists oversaw all completion operations and recorded all subsequent information.

The overall aims of the project were to:

  • Achieve governmental oil on wet cuttings (OOWC) limitations in line with EPA reporting
  • Optimise solids control equipment to deliver maximum solids removal with minimum liquid retention
  • Reduce completion fluid surface consumption
  • Reduce shaker screen consumption
  • Minimise environmental impact
  • Reduce carbon footprint
$935,220.00 > Waste fluid savings
N/A​ % > Final well ROC %

 

For more information contact This email address is being protected from spambots. You need JavaScript enabled to view it. 

  HISTORICAL DATA 94 PDF DOWNLOAD