TEMS International Ltd.

Environmental Rig and Vessel Audits
Image

Environmental Rig and Vessel Audits

Independent SBM / OBM Audit
Getting a rig ready for drilling using Synthetic or Oil based drilling fluids is a comprehensive process. There are many aspects to consider from what rubbers are installed in valves, drill floor fluid containment systems, shock hose requirements, spill procedures and correct permits  to name a few. TEMS International’s experience and proven inspection systems can eliminate costly oversights that are difficult to deal with once a rig is mobilised and operating with oil or synthetic based fluids. TEMS can also manage the pre-project rig fit out process to ensure all necessary steps are taken to ensure your rig has full containment systems in place for the specific drilling environment.

Contact us for more information.